To busy to blog....

Lots of jobs done on the tardis (and then a rather demanding time at work). Here's the progress report:

  1. kitchen cupboard walls and shelves
  2. Remaining walls repaired and recovered.
  3. sietz (now dometic) window fitted near the sink. The view is not important, but the integral blackout blind and fly screen is most welcome. 
  4. New flooring in "hall" using an off cut from work.
  5. Fridge fan replaced (twice) that's another blog.
  6. Fridge light fixed (the 10 V power regulator chip had failed .
  7. New kitchen storage space.
  8. Reading light.
  9. kitchen roll holder (how could we manage without?)
  10. Oven rubber hose changed to copper , plus leak testing - see gas blog
  11. holder for umbrella
  12. yet another solar panel. Now nominally 280 W
  13. Fantastic fan fitted -see picture below..
  14. Straps on battery box replaced- well one broke
  15. Painted remaining walls and covered the other cupboard doors (Karen did them)
  16. Mobile MiFi might now be working.Huawei E5332 with small externel aerial. 
  17. New windscreen on the insurance . Side trims re paired and replaced - do they leak?
  18. Sheepskin rug seat cover-thanks to Karen.
And trips:
A few pictures if you are interested....


Pictures...
Fantastic fan. Fits exactly into the original space. Gives ventilation because we don't have enough power for air con. 

It was going to be a slim drawer,  but a hole seemed just as useful ..and much easier to make !