MOT and jobs for 2017
MOT passed first time
And here is a page of all our mileages
2016 was a good year, in large part due to me retiring and almost finishing three major projects - the crawl through, locker and deadlocks. Chance through up two other unexpected big jobs - the timing belt and brakes.
Jobs for 2017
And here is a page of all our mileages
2016 was a good year, in large part due to me retiring and almost finishing three major projects - the crawl through, locker and deadlocks. Chance through up two other unexpected big jobs - the timing belt and brakes.
Jobs for 2017
- Finishing off
- Locker
- Crawl through
- Fix intermittent radio done I think
- Fix unreliable USB charger done new ones bought
- Fix unreliable fuel gauge done, pins on sender unit
- Painting camper
- Panting chassis
- Build Pneumatic controls
- Get Diesel injectors refurbished. Probably not needed
- Fix some awnings
- Reversing camera
- Get air suspension seats working
- Lining rear brakes done
Comments
Post a Comment